Zanzibar Off-Plan Developments
An editorial directory of Zanzibar residential developments, using linked developer publications. Availability, prices and target dates are developer claims; each profile shows what was checked.
Publisher disclosure: ZNZist’s investor group has property and hospitality interests in Zanzibar, including kizikula. Related-party listings carry their own disclosure.
6 developments match.
Anantara Zanzibar Resort & Residences is an Infinity Developments project on the north coast, signed with Minor Hotels on 5 March 2024 as a 181-key new build of suites, pool villas, apartments and penthouses opening in 2027 (Minor Hotels release). The developer puts gross development value above $150m and markets the residences without publishing prices; its construction page records project commencement on 1 April 2026 and a June 2026 post says milestones are on schedule. Key counts conflict across sources: 181 per Minor Hotels, 110 hotel rooms plus 94 residences for sale per The Citizen (5 Sep 2024), and 229 on Anantara's own site.
Under construction · 2027 (developer and Minor Hotels target)No verified published pricesuite · apartment · penthouse · villa · 181 unitsAzure Michamvi is an all-villa resort residence on the Michamvi peninsula by Azure United Properties: 93 garden, beachfront and overwater villas, 16 of them over the water, sold with a mandatory rental pool and up to 14 owner nights a year (azuremichamvi.com, 31 Oct 2026). Daily News reported it in June 2024 as a 54-villa, $10m Village Group project due early 2025; it was relaunched with Kerten Hospitality as The House Residence Azure Zanzibar in May 2025 with handover targeted for Q4 2026. The developer's current targets are villas in Q4 2027 and hotel opening in Q1 2028, and its pages no longer name an operator.
Under construction · Villas Q4 2027, hotel Q1 2028 (developer targets)from$320,000villa · 93 unitsANGA Zanzibar is a ground-plus-six apartment block on Paje's main road by Zanzibar-registered LZDM Ltd, designed by Lucas Oteyza, with more than 1,000 m² of ground-floor commercial space, two rooftop pools and a mandatory managed rental programme (The Citizen, 8 Sep 2025; angazanzibar.com). The developer's FAQ says construction began in November 2025 with completion targeted for Q3 2027 and 82 apartments, while its second site and 2025 press give 72 duplexes and Q2 2027. Its construction log records foundations complete in March 2026 and second-floor structure in progress in September 2026. The advertised 14 to 16% return is a developer projection.
Under construction · Q3 2027 per developer FAQ; Q2 2027 elsewherefrom$143,000apartment · duplex · 82 unitsChukwani Shores is a beachfront residential development by PADDCO at Chukwani between Stone Town and the airport: 50 one-bed and 50 two-bed apartments, 10 three-bed penthouses, 8 Fahari villas and 2 Maji super villas, 120 units in all (paddco.com, 31 Oct 2026). The developer gives a construction start of Q1 2025 and a target finish of Q3 2027, and its progress page carries monthly site photos through October 2026. The REDA member listing says 115 units. No independent press coverage was found, and a 'villas sold out' claim circulating on social media does not appear on the developer's pages.
Under construction · Q3 2027 (developer target)from$132,900apartment · penthouse · villa · 120 unitsSandbank Villas is a Johari Developers beachfront villa project at Nungwi, launched in February 2024 as 20 three-bedroom villas and since expanded with 12 two-bedroom Oceanview Villas, a five-bedroom Presidential Villa and a planned 30-villa Zubea resort (developer releases, 19 Feb 2024 and 1 Jul 2025); the project site now says 36 villas. The developer's project page lists it as under construction and opening December 2025 with Phase 1 fully reserved, but its construction gallery, updated through February 2026, describes the model villa approaching completion and foundation works in progress, citing material delays at Zanzibar port. No handover has been announced. Rentals are contracted to Hard Launch Hospitality.
Under construction · Dec 2025 target passed; no handover announcedNo verified published pricevilla · 36 unitsThe Soul Fumba is a CPS Africa holiday-apartment resort inside Fumba Town, built in engineered timber around an 80 m man-made lagoon and modelled on the developer's sold-out The Soul Paje. The developer says the first sales batch sold out, a second batch is on sale from $139,900, and two of eight buildings were erected by September 2026, with the first apartments targeted for end 2026, the lagoon for mid 2027 and the full resort for 2028 (fumba.town, 15 Sep 2026). Unit totals conflict: 220 apartments in eight buildings per the developer's newspaper, 236 across three phases per the project FAQ, plus a planned tower of 26 or 45 apartments by 2030.
Under construction · First blocks end 2026, resort 2028 (developer targets)No verified published priceapartment · duplex · penthouse · 220 units
Listings are editorial, not paid, unless marked Sponsored. Prices are the developers’ own published starting figures at the date each listing was last checked and change without notice; nothing here is a valuation or investment advice. Know a development that belongs here, or spotted an error? hi@znzist.com or ZNZist on X