Zanzibar Off-Plan Developments
An editorial directory of Zanzibar residential developments, using linked developer publications. Availability, prices and target dates are developer claims; each profile shows what was checked.
Publisher disclosure: ZNZist’s investor group has property and hospitality interests in Zanzibar, including kizikula. Related-party listings carry their own disclosure.
1 development match.
ANGA Zanzibar is a ground-plus-six apartment block on Paje's main road by Zanzibar-registered LZDM Ltd, designed by Lucas Oteyza, with more than 1,000 m² of ground-floor commercial space, two rooftop pools and a mandatory managed rental programme (The Citizen, 8 Sep 2025; angazanzibar.com). The developer's FAQ says construction began in November 2025 with completion targeted for Q3 2027 and 82 apartments, while its second site and 2025 press give 72 duplexes and Q2 2027. Its construction log records foundations complete in March 2026 and second-floor structure in progress in September 2026. The advertised 14 to 16% return is a developer projection.
Under construction · Q3 2027 per developer FAQ; Q2 2027 elsewherefrom$143,000apartment · duplex · 82 units
Listings are editorial, not paid, unless marked Sponsored. Prices are the developers’ own published starting figures at the date each listing was last checked and change without notice; nothing here is a valuation or investment advice. Know a development that belongs here, or spotted an error? hi@znzist.com or ZNZist on X
← Back to front page